Customization: | Available |
---|---|
Additional Capabilities: | Milling, Drying, Granulating, Coating |
After-sales Service: | Network Support |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1)Base material dispersing mixer
2)High viscosity pump
3)Base storage tank,
4)heating system(according to actual requirements)
5)Vacuum system,
6)Three roller grinding machine(according to actual requirements)
7)multifunctional-dispersing machine
8)Hydraulic discharging machine,
9)Cooling system,
10)Sealant filling machine( plastic bottle filling machine,film filling machine)
11)Raw material storage tank
12)Oven,
13)Batching system,
model | feeding voluma | planetary motor | Revolution speed | Rotation speed | Vacuum |
L | KW | rpm | rpm | mpa | |
XJB-2L | 1.2 | 0.75 | 0-28 | 0-100 | -0.096 |
XJB-5L | 3 | 1.5 | 0-28 | 0-100 | -0.096 |
XJB-20L | 12 | 4 | 0-28 | 0-100 | -0.096 |
XJB-50L | 30 | 5.5 | 0-28 | 0-100 | -0.096 |
XJB-100L | 60 | 11 | 0-28 | 0-100 | -0.096 |
XJB-200L | 120 | 15 | 0-22 | 0-80 | -0.096 |
XJB-300L | 180 | 18.5 | 0-22 | 0-80 | -0.096 |
XJB-500L | 300 | 30 | 0-22 | 0-80 | -0.096 |
XJB-1000 | 600 | 45 | 0-22 | 0-80 | -0.096 |
XJB-1500 | 900 | 55 | 0-22 | 0-80 | -0.096 |
XJB-2000 | 1200 | 75 | 0-22 | 0-80 | -0.096 |
1)Pulp part
The solvent through the liquid metering device is added to the liquid material groove , by Vacuum suction to emulsifying kettle , start low speed anchor mixer , the powder material is sucked into the vacuum emulsifying tank for continuous stirred 10 minutes , then turn on the two sets of vertical high shear emulsifying 10 minutes , finally use horizontal emulsion machine , continuous cycle 30 minutes , finished slurry . A high shear inside the tank and an emulsion pump outside the tank are also used ,Ensure further refinement of materials , and greatly shorten the operation time
2)Paint part
By vacuum , resin , film-forming agent from the liquid tank into the low-speed stirred tank the bag filter is sucked into the low-speed mixer , the emulsion or solvent ,additives , slurry mixing , then adding additives ( thickener ) , blending paint .
3 ) Filter packing
After a good tune paint , vacuum defoaming after 5 minutes , stirring was stopped by a bag coating to semi-automatic filling machine for packaging , When the coating material using a two bag filters , can be switched with each use , does not affect the filling speed
Q : Can you send the formula for the products we want to make ?
A : Our machines can be used for many kinds of product making ,such as Resin , Paint, Adhesive , Cosmetic , Food , Chemicals . There are many kinds of these products , so it's impossible for us to know all the formulas and technologies . We can assist you to find the raw material list you need , and after you place order with us , we can help you to find formula and technology , there will engineers to teach you how to make the product , and the cost will be on your account.
Q : Do you have machines in stock ?
A : Yes , but just the small-scale machines Machines are different with other products , most of the large-scale machines are designed according to our customers 'requirements different customers have different production requirements , so the technical parameter is different for most machines On the other hands , most of the our machines will cover a large area , so once the machines are finished , we will effect shipment after QC .
Q : Can you send the detailed drawings of the machine to us before we place order ?
A : We can send you a draft drawing of the machines , and after you place order and pay the deposit , our engineer will design the send you the detailed drawings . Once you confirm without questions , we will put it into production.
Q : Why does it take at least 20 days to finish the machine ?
A : Once receipt the deposit from you , we will design the drawings and make out the list of the materials and accessories for the production . Once the drawings are finished , our workers will start the production , from welding , polishing , assembling debugging , detection and so on . After finish , they need time to check the machines , if found any possible defect parts , they will return to the production until every part is 100% approved.
Q : Can we pay the balance after we receive the machines and test without problem.
A : It's unnessary to worry about the quality of our machines , we are confident in that . After the machine is finished . we can install and test the machine for you ( if you can not come to our factory ,we can record a video and send to you ) . Only after you check without problems , we will effect shipment .