Customization: | Available |
---|---|
Additional Capabilities: | Milling |
After-sales Service: | Network Support |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1) Reactor is the main chemical reaction of the typical production equipment, which is widely used in resins, adhesives, paint, cosmetics, pharmaceutical and other chemical production.
2) To break down or combined the materials through mixing, filling and cooling, to promote the reaction of polymerization.
3) The reactor consists of body, gears, mixing devices, heating devices, cooling devices, seal composition.
4) Corresponding auxiliary equipment: distillation column, condenser, water separator, collecting cans, filters ect.
model | nominal capaci | actual capci | heating power | jacket capaci | inner pot size | jacket size | hole center | volume |
50L | 50 | 78 | 2*4 | 96 | 400 | 600 | 828 | 10 |
100L | 100 | 127 | 2*6 | 127 | 500 | 700 | 928 | 15 |
300L | 300 | 327 | 4*6 | 218 | 800 | 1000 | 1148 | 20 |
500L | 500 | 509 | 4*9 | 269 | 900 | 1100 | 1252 | 25 |
1000L | 1000 | 1017 | 4*12 | 400 | 1200 | 1400 | 1588 | 40 |
2000L | 2000 | 2154 | 4*15 | 850 | 1400 | 1600 | 1840 | 80 |
3000L | 3000 | 3201 | 5*15 | 1015 | 1600 | 1750 | 2040 | 100 |
4000L | 4000 | 4020 | 5*15 | 1226 | 1600 | 1750 | 2070 | 120 |
5000L | 5000 | 5170 | 5*18 | 1400 | 1800 | 2000 | 2320 | 140 |
Brief description of the process
In view of the principle of confidentiality for customers, the following can only briefly describe the process.
1. The liquid material is added from the liquid feed port on the top of the reactor, and the powder material (or slurry) is also added to the kettle through the manhole under the protection of a dust collector.
2.Stir in the kettle with a paddle mixer.
3. With the rotation of the paddle mixer, the liquid material and the powder material (or slurry) are gradually mixed uniformly.
4. When the materials in the kettle meet the quality requirements, open the bottom valve of the kettle. The finished material is discharged to the finished tank.
5.Fill from the finished product tank to the filling machine.
Q : Can you send the formula for the products we want to make ?
A : Our machines can be used for many kinds of product making ,such as Resin , Paint, Adhesive , Cosmetic , Food , Chemicals . There are many kinds of these products , so it's impossible for us to know all the formulas and technologies . We can assist you to find the raw material list you need , and after you place order with us , we can help you to find formula and technology , there will engineers to teach you how to make the product , and the cost will be on your account.
Q : Do you have machines in stock ?
A : Yes , but just the small-scale machines Machines are different with other products , most of the large-scale machines are designed according to our customers 'requirements different customers have different production requirements , so the technical parameter is different for most machines On the other hands , most of the our machines will cover a large area , so once the machines are finished , we will effect shipment after QC .
Q : Can you send the detailed drawings of the machine to us before we place order ?
A : We can send you a draft drawing of the machines , and after you place order and pay the deposit , our engineer will design the send you the detailed drawings . Once you confirm without questions , we will put it into production.
Q : Why does it take at least 20 days to finish the machine ?
A : Once receipt the deposit from you , we will design the drawings and make out the list of the materials and accessories for the production . Once the drawings are finished , our workers will start the production , from welding , polishing , assembling debugging , detection and so on . After finish , they need time to check the machines , if found any possible defect parts , they will return to the production until every part is 100% approved.
Q : Can we pay the balance after we receive the machines and test without problem.
A : It's unnessary to worry about the quality of our machines , we are confident in that . After the machine is finished . we can install and test the machine for you ( if you can not come to our factory ,we can record a video and send to you ) . Only after you check without problems , we will effect shipment .